Sr. No. | Laboratory Name | Lab Incharge |
---|---|---|
1 | Basic Electrical Lab | MS. Jirange S.N. |
2 | Electrical Machine Lab | Mr. Marne P.P. |
3 | Electrical Measurement Lab | Mr. Govekar N.S. |
4 | Electrical Power System Lab | Mr. Veer A. |
5 | Basic Electronics Lab | Mrs. Konde V.V. |
Sr. No. | Name of Major Equipment | Purchase Date | Rate (Rs.) | Quantity | Total Amount (Rs.) |
---|---|---|---|---|---|
1 | Transformer Rectifier unit I/p 3ph, 415V AC supply O/p- 230V,20A DC supply | 20/6/10 | 44000 | 01 | 44000 |
2 | 2MHz Function Generator | 22/08/2012 | 11500 | 02 | 23000 |
3 | Dual Oscilloscope 20 MHZ | 22/12/19 | 3500 | 01 | 3500 |
4 | Lamp Bank Loading- 1ph, 230V, 10A with 16 controls | 20/6/10 | 6700 | 01 | 6700 |
5 | Fabricated & power coated DC supply terminal boards with 16A,4P, MCB-1 | 20/6/10 | 2450 | 02 | 4900 |
6 | Fabricated & power coated AC supply terminal boards with 16A,4P,MCB- | 20/6/10 | 03 | 3800 | 11400 |
7 | Dual DC regulated Power supply | 22/08/2012 | 01 | 20500 | 20500 |
Total Investment | 4,47,526 |
Sr. No. | Name of Major Equipment | Purchase Date | Rate (Rs.) | Quantity | Total Amount (Rs.) |
---|---|---|---|---|---|
1 | Kelvin Double Bridge | 3/10/11 | 13500 | 01 | 13500 |
2 | Anderson Bridge | 3/10/12 | 12400 | 04 | 12400 |
3 | Displacement by LVDT | 3/10/11 | 11800 | 01 | 11800 |
4 | CT/PT | 3/10/11 | 18900 | 01 | 18900 |
5 | 3 phase Autotransform | 22/8/12 | 16300 | 01 | 16300 |
6 | Earth resistance by Analog Tester | 3/10/11 | 5800 | 01 | 5800 |
7 | 3 phase Rheostat bank | 22/8/12 | 19500 | 01 | 19500 |
Total Investment | 327240 |
Sr. No. | Name of Major Equipment | Purchase Date | Rate (Rs.) | Quantity | Total Amount (Rs.) |
---|---|---|---|---|---|
1 | Oil Tester Unit | 3/10/2011 | 27,000 | 02 | 54,000 |
2 | Over current Relay Unit | 27/08/2012 | 14,000 | 01 | 14,000 |
3 | AC supply terminal Boards | 22/08/2012 | 6,500 | 04 | 26,000 |
4 | DC supply Boards MD Electricals | 22/08/2012 | 3,800/- | 01 | 3,800/- |
5 | Three Phase Auto Transformer 440V, 10A | 22/08/2012 | 16,300/ | 01 | 16,300/ |
6 | Lamp Bank 3 Phase, 10A, 415V | 3/10/2011 | 13,000 | 01 | 13,000 |
7 | Digital Clamp Meter | 9/12/2021 | 1,100 | 01 | 1,100 |
Total Investment | 161,368 |
Sr. No. | Name of Major Equipment | Purchase Date | Rate (Rs.) | Quantity | Total Amount (Rs.) |
---|---|---|---|---|---|
1 | Single DC regulated power supply, input: 1-phase, 230V AC | 20.06.2010 | 4,580 | 06 | 27,480 |
2 | Testing & identification of different types of resistors, find out tolerance & wattage of resistor depending on size. | 20.06.2010 | 1,950 | 02 | 3,900 |
3 | To identify different types of relays, measurement of contact resistance, operating time, release time, bounce time, pick up voltage, drop out voltage | 20.06.2010 | 4,500 | 02 | 9,000 |
4 | V-I characteristics of SCR (Silicon Automation Systems) | 12.09.2012 | 5,700 | 02 | 11,400 |
5 | Transistorized monostable multivibrator (Silicon Automation Systems) | 12.09.2012 | 1,600 | 02 | 3,200 |
6 | Frequency of negative feedback amplifier (Silicon Automation Systems) | 12.09.2012 | 1,600 | 02 | 3,200 |
7 | Variation of resistance linear/Logarithmic | 5.03.2013 | 2,700 | 01 | 2,700 |
Total Investment | 6,75,476 |